Drivers are forced to deal with a closure on Northbound 475 between Bristol and Atherton, that will last for around two weeks.

The closure is so that crews can do much needed bridge work, along with some pavement repairs on the stretch of road.

Drivers will be routed off onto Grand Traverse at Bristol, and back on to the expressway at Atherton Rd.

The good news is that the work is only expected to last two weeks, but the final project is far from over.  The Southbound lanes in the same stretch will be closed for about 20 days after the Northbound lanes are completed.

When driving through the stretch, please drive slow so that road workers, and neighborhood kids can be safe.

More From Club 93.7